Flowchart of activated Carbon 生産工程

Key process equipment and control parameters
| 主要なプロセス | 主要機器 | 制御パラメータ |
| Raw material acceptance | ウェイブリッジ | Raw materials must undergo sensory inspection and weighing before being put into storage. Before feeding, they must be treated by air classifier and screening machine to remove soil and stones before being fed into the warehouse. |
| 炭化 | ロータリー furnace, waste heat boiler | Integrated carbonization and activation: preheating stage is 6 hours; carbonization stage is 8 hours; activation stage is 10 hours; steam is continuously supplied during the feeding process. |
| アクティベーション | Sleip Activation Furnace | Individual activation: The activation stage includes three stages (heating of carbonized material, activation, and cooling), which takes 24 hours. Steam is continuously supplied during the feeding process for 10-12 hours. |
| 粉砕と選別 | Crushing unit, magnetic separator, dust collector, screening machine | その 活性炭 is crushed and screened according to customer requirements (to remove impurities such as dust, loose carbon, and iron filings). Dust recovery must be ensured during crushing and screening. |
| パッケージ | Material packaging machine | Upon entering the packaging room, adjust the packaging weight and package the product. The net content of the packaged product must be accurate, and any allowable shortage must comply with the provisions of the "Regulations on the Supervision and Management of Quantitatively Packaged Commodities". |
- Random Content
- 注目のコンテンツ
- 注目のレビューコンテンツ
- T-610コレクターサリチルオキシム酸誘導体含有量3.5%
- 粉末乳剤爆薬
- 高強度・高精度の衝撃管雷管
- 食品用無水塩化カルシウム
- トリエタノールアミン(TEA)
- 無水フタル酸
- 99% 動物飼料添加物 DL メチオニン






オンラインメッセージ相談
コメントを追加: