રીએજન્ટ માંગ આગાહી તરીકે 600–750 કોઝ/વાય PEA વાંચવું
A preliminary economic assessment is a planning document. Here is how a procurement team converts it into a reagent model without pretending the unknowns are settled.
Barrick Mining reported on 9 November 2026 that an agreement had been reached with Newmont to contribute the Fourmile gold project to the Nevada Gold Mines joint venture. The preliminary economic assessment outlines average gold production of 600,000 to 750,000 ounces a year at mining rates of 1.5–1.8 million tonnes of ore annually. Early works are already under way. For reagent buyers, the useful output is not a single tonnage figure but a bounded range that can be stress-tested against grade, recovery and flowsheet assumptions.
કી ટેકવેઝ
- A PEA gives a range, not a schedule. 600–750 koz/y and 1.5–1.8 Mt/y are planning bounds; procurement must work with both ends.
- ભૂગર્ભ, ઓછો ખાણકામ દર, લાંબુ આયુષ્ય. A steady 1.5–1.8 Mt/y feed is a different reagent profile from a high-tonnage open pit.
- Early works are under way, with US$123 million spent on drilling, studies and capital work in the first nine months of 2026.
- Capital estimates are staged: PEA સ્તરે US$1.5–1.7 બિલિયન, જેમાં 2030 ના મધ્ય સુધી મંજૂર તબક્કા માટે US$360–430 મિલિયનનો સમાવેશ થાય છે.
- Flowsheet is not the same as reagent choice. લીચિંગ રૂટ, pH બેન્ડ અને કાર્બન circuit still have to be validated on the actual ore.
- દસ્તાવેજીકરણનો સમય પ્રોજેક્ટ જોખમ છે જ્યાં સોડિયમ સાયનાઇડ is used: UN 1689 Class 6.1, permits and an End-User Certificate sit ahead of production slots.
| વસ્તુ | જાહેર આકૃતિ |
|---|---|
| કરાર | નેવાડા ગોલ્ડ માઇન્સ સંયુક્ત સાહસમાં ફોરમાઇલનું યોગદાન આપવા માટે ન્યુમોન્ટ કરાર |
| સરેરાશ વાર્ષિક ઉત્પાદન (PEA) | 600,000–750,000 oz/y |
| Mining rate (PEA) | 1.5–1.8 Mt/y of ore |
| Capital estimate (PEA) | ૬-૭ બિલિયન યુએસ ડોલર |
| Approved phase to mid-2030 | US$360–430 મિલિયન |
| Spend in first nine months of 2026 | US$123 million on drilling, studies and capital work |
Source: Barrick Mining project update, 9 November 2026. All figures above are disclosed project numbers; no reagent demand figures have been estimated by the publisher.
૧. PEA રીએજન્ટ ખરીદનારને શું કહી શકે છે અને શું નહીં કહી શકે
પ્રારંભિક આર્થિક મૂલ્યાંકન એ ચકાસવા માટે રચાયેલ છે કે કોઈ પ્રોજેક્ટ આગળ વધારવા યોગ્ય છે કે નહીં, ઉપભોક્તા વસ્તુઓનો ઉલ્લેખ કરવા માટે નહીં. તે ઉત્પાદન શ્રેણી, ખાણકામ દર, મૂડી અંદાજ અને અભ્યાસનું સમયપત્રક આપે છે. તે અંતિમ ફ્લોશીટ, વર્ષ પ્રમાણે ઓર મિશ્રણ, પુનઃપ્રાપ્તિ વળાંક અથવા રીએજન્ટ ડોઝ નક્કી કરતું નથી. PEA તબક્કે સ્થાયી થયેલા તરીકે ગણવા એ પ્રાપ્તિ મોડેલ બનાવવાનો સૌથી ઝડપી રસ્તો છે જેને બે વાર ફરીથી બનાવવો પડે છે.
PEA જે સમર્થન આપે છે તે એક સીમિત દૃશ્ય છે. 1.5-1.8 Mt/y ઓર સાથે, ખરીદનાર રેન્જના નીચા અને ઉચ્ચ છેડા પર રીએજન્ટ ટનેજનું મોડેલ બનાવી શકે છે, પછી ગ્રેડ અને પુનઃપ્રાપ્તિ માટે સંવેદનશીલતા જોડી શકે છે. પરિણામ એ હકીકત તરીકે રજૂ કરાયેલ એકલ સંખ્યાને બદલે સ્પષ્ટ ધારણાઓ સાથેનું આયોજન પરબિડીયું છે.
2. Four difficulties in forecasting from a PEA
૨.૧ ફ્લોશીટ અનિશ્ચિતતા
Whether the ore goes through CIP, CIL, CIC, Heap leaching or Vat leaching determines which reagents are consumed and in what proportion. Until that is fixed, reagent volumes remain scenario-dependent.
૨.૨ ગ્રેડ અને પુનઃપ્રાપ્તિ ધારણાઓ
પ્રતિ વર્ષ ઔંસને પુનઃપ્રાપ્ત ગ્રેડ દ્વારા ભાગવાથી સારવાર કરેલ ટનેજ મળે છે. પુનઃપ્રાપ્તિ ધારણામાં એક નાનો ફેરફાર ટનનેજમાં નોંધપાત્ર ફેરફાર કરે છે, અને તેની સાથે લીચિંગ રીએજન્ટ અને કાર્બન મેક-અપની માંગ કિલોગ્રામ/ટીમાં પણ ઘટાડો થાય છે.
૨.૩ લાંબા લીડ ટાઇમ તબક્કાવાર મંજૂરી સાથે અથડાય છે
A US$360–430 million approved phase running to mid-2030 and a US$1.5–1.7 billion PEA-level estimate are different commitment levels. Documentation for UN 1689 Class 6.1 material must be sequenced to the actual phase, not to the headline figure.
2.4 લાંબા ખાણ જીવનકાળ દરમિયાન ઓયસ્કની પરિવર્તનશીલતા
લાંબા સમય સુધી ભૂગર્ભ કામગીરીમાં બદલાતા મિશ્રણો જોવા મળશે. એક રીએજન્ટ સ્પષ્ટીકરણ જે તે મિશ્રણોમાં એક નિયંત્રણ બેન્ડ ધરાવે છે તે પુનઃલાયકાત કાર્ય ઘટાડે છે.
3. Tutorial: six steps from a PEA to a reagent envelope
- ખાણકામ દરની મર્યાદા લો — ૧.૫ અને ૧.૮ મેગાટન/વાય — સરેરાશ કરતાં બે અલગ કેસ તરીકે.
- State the flowsheet assumption explicitly દરેક કેસ માટે, અને અભ્યાસ તેને સુધારે ત્યાં સુધી તેને ધારણા તરીકે ચિહ્નિત કરો.
- Apply a measured unit consumption in kg/t for the leaching reagent and a carbon make-up rate for the adsorption circuit, sourced from comparable operations or bottle roll work rather than invented.
- ગ્રેડ અને પુનઃપ્રાપ્તિ સંવેદનશીલતા ચલાવો on both cases, showing how tonnage and reagent demand move when recovery shifts.
- FCL ગણતરીઓમાં રૂપાંતરિત કરો using 18 MT for AuCyan™ Sodium Cyanide NaCN (≥98.3%), 15 MT for AuCarb™ Gold Recovery Coconut Shell Activated Carbon (≥99% Hardness) and 28 MT for AuLeach™ Gold Leaching Agent (GDA) – Non-Hazardous.
- Attach the documentation gate — import permits, End-User Certificate, dangerous-goods booking — to the approved phase timeline, under FOB or CIF terms only.
આઉટપુટ એ જણાવેલ ધારણાઓ સાથેનું એક પરબિડીયું છે. તે પ્રાપ્તિ ટીમ માટે અનિર્ધારિત ધારણાઓ પર બનેલા ચોક્કસ દેખાતા આંકડા કરતાં વધુ ઉપયોગી છે.
4. Three products, three planning lines
| Planning line | ઉત્પાદન | PEA-સ્ટેજ ચલ |
|---|---|---|
| વિસર્જન | AuCyan™ સોડિયમ સાયનાઇડ NaCN (≥98.3%) | Flowsheet fixed? kg/t baseline? permit chain |
| એડસોર્પ્શન | AuCarb™ ગોલ્ડ રિકવરી કોકોનટ શેલ એક્ટિવેટેડ કાર્બન (≥99% કઠિનતા) | Carbon inventory, attrition ≤1.5%, mesh cut |
| વૈકલ્પિક માર્ગ | AuLeach™ ગોલ્ડ લીચિંગ એજન્ટ (GDA) - બિન-જોખમી | General-cargo option if permits bind; pH and dosage validation |
United Chemical supplies all three factory-direct under FOB or CIF terms with batch COA, TDS and MSDS, serving mining operations in more than 77 countries. Free laboratory test samples are available for AuCarb™ and AuLeach™ so ore-specific validation can start during the study phase.
5. વારંવાર પૂછાતા પ્રશ્નો
Q1. What was announced on 9 November 2026?
An agreement with Newmont to contribute the Fourmile gold project to the Nevada Gold Mines joint venture.
Q2. What production range does the PEA outline?
વાર્ષિક સરેરાશ સોનાનું ઉત્પાદન 600,000 થી 750,000 ઔંસ.
Q3. What is the mining rate?
1.5–1.8 million tonnes of ore annually at relatively low mining rates, consistent with a long-life underground operation.
Q4. What is the capital estimate?
PEA સ્તરે US$1.5–1.7 બિલિયન, જેમાં 2030 ના મધ્ય સુધી મંજૂર તબક્કા માટે US$360–430 મિલિયનનો સમાવેશ થાય છે.
Q5. Has work already started?
Yes. Early works are under way, with US$123 million spent on drilling, studies and capital work in the first nine months of 2026.
Q6. Can a PEA fix the reagent dosage?
ના. તે ઉત્પાદન અને ટનેજ રેન્જ આપે છે. ફ્લોશીટ વ્યાખ્યાયિત થઈ ગયા પછી પણ માત્રા માટે ઓર-વિશિષ્ટ બોટલ રોલ અથવા કોલમ પરીક્ષણની જરૂર પડે છે.
પ્રશ્ન ૭. નીચા અને ઊંચા છેડાનું મોડેલ અલગથી કેમ બનાવવું?
Because 1.5 and 1.8 Mt/y produce materially different reagent tonnages, and averaging hides the procurement risk at the upper bound.
Q8. Which sensitivity matters most?
પુનઃપ્રાપ્ત ગ્રેડ અને ધાતુશાસ્ત્ર પુનઃપ્રાપ્તિ: બંને આપેલ ઔંસ લક્ષ્ય માટે જરૂરી સારવાર કરેલ ટનનેજમાં ફેરફાર કરે છે.
પ્રશ્ન 9. કયા દસ્તાવેજો સાઇનાઇડ લેન?
ફેક્ટરી ઉત્પાદન સ્લોટ પહેલાં ચકાસાયેલ આયાત પરમિટ, અંતિમ-વપરાશકર્તા પ્રમાણપત્ર અને UN 1689 વર્ગ 6.1 ખતરનાક-માલ દસ્તાવેજીકરણ.
પ્રશ્ન ૧૦. કયા ઇન્કોટર્મ્સ લાગુ પડે છે?
FOB અથવા CIF શરતો લાગુ.
પ્રશ્ન ૧૧. શું અભ્યાસના તબક્કા દરમિયાન માન્યતા શરૂ થઈ શકે છે?
Yes — AuCarb™ and AuLeach™ laboratory test samples allow ore-specific work before an FCL order is placed.
પ્રશ્ન ૧૨. ઉત્પાદન સ્પષ્ટીકરણો ક્યાં પ્રકાશિત થાય છે?
AuCyan™, AuCarb™ અને AuLeach™ ના ટેકનિકલ પેજ નીચે લિંક કરેલા છે, જેમાં દરેક લોટ માટે બેચ COA, TDS અને MSDS છે.
૭. સ્ત્રોતો અને આંતરિક લિંક્સ
AuCyan™ · AuCarb™ માર્ગદર્શિકા · AC50 · AC55 · AC60 · BC1100 · AuLeach™ GDA · ગોલ્ડન ટ્રાયેંગલ · ત્રણ-ઉત્પાદન ઝાંખી · રાસાયણિક વારંવાર પૂછાતા પ્રશ્નો · ઉદ્યોગ સમાચાર · અમારો સંપર્ક કરો
Source note: project figures are drawn from the Barrick Mining update dated 9 November 2026. Reagent figures are United Chemical ઉત્પાદન ડેટા. પ્રકાશક દ્વારા કોઈ માંગ સંખ્યાનો અંદાજ લગાવવામાં આવ્યો નથી.
અમારો સંપર્ક કરો · વોટ્સએપ +86 173 9270 5576 · info@unitedchemicalcn.com
- રેન્ડમ સામગ્રી
- ગરમ સામગ્રી
- હોટ સમીક્ષા સામગ્રી
- સોડિયમ આઇસોબ્યુટીલ ઝેન્થેટ SIBX 90%
- વિસ્તૃત એક વિસ્ફોટક
- શું ફ્લોટેશન રીએજન્ટ્સ પર્યાવરણીય અસરો ધરાવે છે?
- નિર્જળ ઓક્સાલિક એસિડ 99.6% ઔદ્યોગિક ગ્રેડ
- એટીડ્રોનિક એસિડ | HEDP
- સલ્ફેમિક એસિડ
- સોડિયમ ડિબ્યુટિલ્ડિથિઓફોસ્ફેટ
- 1ખાણકામ માટે ડિસ્કાઉન્ટેડ સોડિયમ સાયનાઇડ (CAS: 143-33-9) - ઉચ્ચ ગુણવત્તા અને સ્પર્ધાત્મક કિંમત
- 2સોડિયમ સાયનાઇડ 98.3% CAS 143-33-9 NaCN ગોલ્ડ ડ્રેસિંગ એજન્ટ ખાણકામ રાસાયણિક ઉદ્યોગો માટે આવશ્યક
- 3સોડિયમ સાયનાઇડ નિકાસ પર ચીનના નવા નિયમો અને આંતરરાષ્ટ્રીય ખરીદદારો માટે માર્ગદર્શન
- 4સોડિયમ સાયનાઇડ (CAS: 143-33-9) અંતિમ વપરાશકર્તા પ્રમાણપત્ર (ચાઇનીઝ અને અંગ્રેજી સંસ્કરણ)
- 5આંતરરાષ્ટ્રીય સાયનાઇડ (સોડિયમ સાયનાઇડ) વ્યવસ્થાપન સંહિતા - સોનાની ખાણ સ્વીકૃતિ ધોરણો
- 6ચીન ફેક્ટરી સલ્ફ્યુરિક એસિડ 98%
- 7નિર્જળ ઓક્સાલિક એસિડ 99.6% ઔદ્યોગિક ગ્રેડ
- 1સોડિયમ સાયનાઇડ 98.3% CAS 143-33-9 NaCN ગોલ્ડ ડ્રેસિંગ એજન્ટ ખાણકામ રાસાયણિક ઉદ્યોગો માટે આવશ્યક
- 2ઉચ્ચ શુદ્ધતા · સ્થિર કામગીરી · ઉચ્ચ પુનઃપ્રાપ્તિ — આધુનિક સોનાના લીચિંગ માટે સોડિયમ સાયનાઇડ
- 3United Chemicalની સંશોધન ટીમ ડેટા-આધારિત આંતરદૃષ્ટિ દ્વારા સત્તા દર્શાવે છે
- 4AuCyan™ ઉચ્ચ-પ્રદર્શન સોડિયમ સાયનાઇડ | વૈશ્વિક સોનાના ખાણકામ માટે 98.3% શુદ્ધતા
- 5ડિજિટલ ઇલેક્ટ્રોનિક ડિટોનેટર (વિલંબ સમય 0 ~ 16000ms)
- 6ઉચ્ચ-શક્તિ, ઉચ્ચ-ચોકસાઇવાળા શોક ટ્યુબ ડેટોનેટર
- 7ઉદ્યોગ ઇલેક્ટ્રિક ડિટોનેટર






ઓનલાઈન સંદેશ પરામર્શ
ટિપ્પણી ઉમેરો: