
UNITED CHEMICAL · WARTA INDUSTRI · 27 NOVEMBER 2026
A restart bounded by stockpiles and by safety
Processing existing ore is not the same as returning to full mining.
Anagold Mining has restarted the Çöpler gold mine in eastern Türkiye under a temporary operating licence, processing stockpiled ore and targeting about 1.3 tonnes of gold by the end of 2026, according to Europe Mining News. The mine produced about 6.9 tonnes in 2023, roughly one-fifth of Türkiye's gold output. Its suspension followed a heap leach pad failure in February 2024 that killed nine workers and injured two. Turkish conglomerate Cengiz Holding bought SSR Mining's 80% stake earlier in 2026 for US$1.49 billion.
1. What a stockpile-only restart means technically
Existing stockpiled ore has a known grade and a known exposure history. That makes the metallurgical task narrower than a fresh mine start: the leach circuit can be calibrated against material that has already been characterised. In a Tumpukan leaching operation, gold from the pad is recovered from pregnant solution, typically in Karbon-ing-Kolom (CIC) service. Solution clarity and Karbon loading rate dominate; hardness matters less than in an agitated tank but still governs handling losses.
2. The licence boundary
The reporting is explicit that the current phase is restricted to existing stockpiles rather than a full return to mining. Any move beyond that depends on permanent permitting and on the views of regulators, local communities and the courts on the site's safety record. A seismic study found the slope had been deforming for at least four years before failure, and an independent review linked the collapse to a third-party design flaw. For a supplier, this is a clear boundary: supply planning should track the licence scope, not assume a full restart.
Segitiga Emas — telung produk, siji pemasok
AuCyan™ Natrium Sianida NaCN (≥98.3%) · Karbon Aktif Batok Kelapa Pemulihan Emas AuCarb™ (Kekerasan ≥99%) · Agen Pelindian Emas AuLeach™ (GDA) – Ora Mbebayani
3. Worked volume check
A target of 1.3 tonnes of gold by year-end is roughly 41,800 ounces. If the stockpile leach circuit runs at 80% recovery, the contained gold processed is about 52,000 ounces. At a carbon loading of 2,000 g/t on loaded carbon, that implies around 26 tonnes of loaded carbon over the campaign — a figure that sets the handling and elution schedule. Exact values depend on site data; the method is what matters for planning a bounded restart.
Target: 1.3 t ≈ 41,800 oz
Indicative loaded carbon: ≈ 26 t at 2,000 g/t
4. Reagent fit for a bounded restart
For column service, BC1100 class carbon is the usual evaluation starting point, selected on K and R values measured with site solution. Natrium Sianida AuCyan™ NaCN (≥98.3%) ships under licensed import at 18 MT saben wadhah. Agen Pelindian Emas AuLeach™ (GDA) – Ora Mbebayani dievaluasi ing ngendi diidinake ing 28 MTKabeh dikirim nganggo batch COA, TDS lan MSDS in Kantong PE laminasi tugas berat 25 kg ing FOB / CIF syarat-syarat
3b. Stockpile oxidation and leach kinetics
Stockpiled ore is not fresh ore. Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites, and log solution grade curves rather than relying on historical recovery figures. For a Tumpukan leaching circuit, irrigation rate and solution pH are the two operational levers; for Karbon-ing-Kolom recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less — every tonne processed has to earn its place in a bounded campaign.
3c. Stockpiles are not fresh ore
Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites and log solution grade curves rather than relying on historical recovery figures. For a Tumpukan leaching circuit, irrigation rate and solution pH are the two operational levers; for Karbon-ing-Kolom recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less: every tonne processed has to earn its place in a bounded campaign.
5. Pitakonan
Q1 — What restarted at Çöpler?
Processing of stockpiled ore under a temporary operating licence.
Q2 — What is the target?
About 1.3 tonnes of gold by the end of 2026.
Q3 — Is full mining resumed?
No — the current phase is limited to existing stockpiles.
Q4 — Which recovery route applies?
Heap leaching with carbon-in-column recovery from pregnant solution.
Q5 — Apa syarat-syarat sing kasedhiya?
FOB utawa CIF nganggo COA, TDS lan MSDS batch.
Q6 — Do you serve West Asia?
Yes — more than 77 countries including West Asian markets.
Plan supply to the licence scope
Send your stockpile grade and recovery route. We return a column-service carbon and reagent dossier.
Hubungi Kami · Pandhuan AuCarb™ · FAQ Kimia · Warta Industri
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Europe Mining News, November 2026, reporting on the Çöpler stockpile restart.
- Konten Acak
- Konten panas
- Konten review panas
- Kelas industri sodium hexametaphosphate 68% SHMP
- Kalium Permanganat - Kelas Industri
- Kepiye carane milih flokulan sing bener?
- Kepiye carane bisa ngoptimalake panggunaan bahan kimia ing pangolahan bijih?
- Asam sulfat
- 1Diskon Sodium Cyanide (CAS: 143-33-9) kanggo Pertambangan - Kualitas Tinggi & Rega Kompetitif
- 2Natrium Sianida 98.3% CAS 143-33-9 NaCN agen pembalut emas Penting kanggo Industri Kimia Pertambangan
- 3Peraturan Anyar China babagan Ekspor Sodium Sianida lan Pandhuan kanggo Pembeli Internasional
- 4Sodium Cyanide (CAS: 143-33-9) Sertifikat pangguna akhir (versi Cina lan Inggris)
- 5Kode Manajemen Sianida Internasional (Sodium sianida) - Standar Penerimaan Tambang Emas
- 6Pabrik China Asam Sulfat 98%
- 7Asam oksalat anhidrat 99.6% Kelas Industri
- 1Natrium Sianida 98.3% CAS 143-33-9 NaCN agen pembalut emas Penting kanggo Industri Kimia Pertambangan
- 2Kemurnian Tinggi · Kinerja Stabil · Pemulihan sing luwih dhuwur - sodium sianida kanggo leaching emas modern
- 3United ChemicalTim Riset Nduduhake Wewenang Liwat Wawasan sing Didorong Data
- 4Natrium Sianida Kinerja Tinggi AuCyan™ | Kemurnian 98.3% kanggo Pertambangan Emas Global
- 5Detonator Elektronik Digital (Waktu tundha 0 ~ 16000ms)
- 6Dhuwur-kekuwatan, Dhuwur-tliti Shock Tube Detonator
- 7Industri Detonator Listrik










Konsultasi pesen online
Tambah komentar: