
UNITED CHEMICAL · ინდუსტრიის სიახლეები · 27 ნოემბერი, 2026
A heap-leach ramp, then a CIL plant
Two processing routes on one site means two qualification programmes.
PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.
1. Stage one: heap leaching at 8 Mt/y
A heap-leach facility at this scale is a Carbon-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 არის ხარისხი, რომელიც ჩვეულებრივ ფასდება სვეტისთვის და გროვის გამორეცხვა service, selected on K and R values measured with the site's own solution.
2. Stage two: CIL from 2028
The company plans to develop a ნახშირბადის გამორეცხვა (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.
ოქროს სამკუთხედი — სამი პროდუქტი, ერთი მომწოდებელი
AuCyan™ ნატრიუმის ციანიდი NaCN (≥98.3%) · AuCarb™ ოქროს აღმდგენი ქოქოსის ნაჭუჭით გააქტიურებული ნახშირბადი (≥99% სიმტკიცე) · AuLeach™ ოქროს გამოტუტვის აგენტი (GDA) – არასახიფათო
3. Worked scale check
At 8 million tonnes a year through the heap leach, a ციანიდი demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.
Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year
CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year
4. Product fit across both stages
AuCyan™ ნატრიუმის ციანიდი NaCN (≥98.3%) supplies leaching at 18 MT თითო კონტეინერში. AuCarb™ ოქროს აღდგენა ქოქოსის ნაჭუჭით გააქტიურებული ნახშირბადი (≥99% სიმტკიცე) is specified differently for column and agitated service at 15 MT თითო კონტეინერში. AuLeach™ ოქროს გამოტუტვის აგენტი (GDA) – არასახიფათო შეფასებულია იქ, სადაც დაშვებულია 28 MTყველა პარტია იგზავნება COA, TDS მდე MSDS in 25 კგ-იანი მძიმე ლამინირებული PE პარკები ქვეშ FOB / CIF ვადები.
3b. Ramp-up is where carbon is lost
A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.
3c. Ramp-up is where carbon is lost
A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.
5. კითხვა
Q1 — What did EMAS report?
US$43 million EBITDA with gold production up 69% quarter on quarter.
Q2 — What is Pani's resource?
7.0 million ounces of gold with an estimated 15-year mine life.
Q3 — What is planned for 2028?
A CIL facility scaling to 12 Mt/y by 2029.
Q4 — Does carbon spec change between stages?
Yes — column service favours activity; CIL favours hardness and low attrition.
კითხვა 5 — რა პირობებია ხელმისაწვდომი?
FOB ან CIF პარტიის COA-თი, TDS-ით და MSDS-ით.
Q6 — Can carbon be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.
Qualify stage two during stage one
Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.
კონტაქტი · BC1100 · ოქროს სამკუთხედის მიმოხილვა · სამრეწველო ახალი ამბები
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.
- შემთხვევითი შინაარსი
- ცხელი შინაარსი
- მიმოხილვის ცხელი შინაარსი
- გარემოს მენეჯმენტის სისტემის სერთიფიკატი
- ოქსილის მჟავა მოპოვებისთვის 99.6%
- გაფართოებული AN ასაფეთქებელი
- მეტალი ნატრიუმი, ≥99.7%
- ნატრიუმის ბისულფიტი 99% მაღალი ხარისხის ქარხნული მიწოდება
- 1ფასდაკლებული ნატრიუმის ციანიდი (CAS: 143-33-9) სამთო მოპოვებისთვის - მაღალი ხარისხის და კონკურენტული ფასები
- 2ნატრიუმის ციანიდი 98.3% CAS 143-33-9 NaCN ოქროს გასაპრიალებელი საშუალება, აუცილებელი სამთო-ქიმიური მრეწველობისთვის
- 3ჩინეთის ახალი რეგულაციები ნატრიუმის ციანიდის ექსპორტის შესახებ და სახელმძღვანელო საერთაშორისო მყიდველებისთვის
- 4ნატრიუმის ციანიდი (CAS: 143-33-9) საბოლოო მომხმარებლის სერთიფიკატი (ჩინური და ინგლისური ვერსია)
- 5ციანიდის (ნატრიუმის ციანიდის) მართვის საერთაშორისო კოდი - ოქროს მაღაროს მიღების სტანდარტები
- 6ჩინეთის ქარხანა გოგირდის მჟავა 98%
- 7უწყლო ოქსილის მჟავა 99.6% სამრეწველო ხარისხი
- 1ნატრიუმის ციანიდი 98.3% CAS 143-33-9 NaCN ოქროს გასაპრიალებელი საშუალება, აუცილებელი სამთო-ქიმიური მრეწველობისთვის
- 2მაღალი სისუფთავე · სტაბილური მუშაობა · უფრო მაღალი აღდგენა — ნატრიუმის ციანიდი თანამედროვე ოქროს გამორეცხვისთვის
- 3United Chemicalკვლევითი გუნდი მონაცემებზე დაფუძნებული ანალიზის საშუალებით ავლენს ავტორიტეტს
- 4AuCyan™ მაღალი ხარისხის ნატრიუმის ციანიდი | 98.3%-იანი სისუფთავე გლობალური ოქროს მოპოვებისთვის
- 5ციფრული ელექტრონული დეტონატორი (დაყოვნების დრო 0~ 16000ms)
- 6მაღალი სიმტკიცის, მაღალი სიზუსტის დარტყმის მილის დეტონატორი
- 7ინდუსტრიის ელექტრო დეტონატორი










ონლაინ შეტყობინების კონსულტაცია
კომენტარის დამატება: