انڊونيشيا جي پاڻي مائن هيپ ليچ تي سون جي پيداوار 69 سيڪڙو وڌائي

EMAS posts US$43 million EBITDA and plans a 2028 CIL plant — a two-stage consumables story.

Black granular coconut-shell activated carbon piled in a white bowl

UNITED CHEMICAL · صنعت جون خبرون · 27 نومبر 2026

A heap-leach ramp, then a CIL plant

Two processing routes on one site means two qualification programmes.

PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.

1. Stage one: heap leaching at 8 Mt/y

A heap-leach facility at this scale is a ڪاربن-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 اهو گريڊ آهي جيڪو عام طور تي ڪالمن لاءِ جائزو ورتو ويندو آهي ۽ ڍير جي ليچنگ service, selected on K and R values measured with the site's own solution.

2. Stage two: CIL from 2028

The company plans to develop a ڪاربن-ان-ليچ (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.

3. Worked scale check

At 8 million tonnes a year through the heap leach, a سري لنڪا demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.

Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year

CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year

4. Product fit across both stages

آو سائان ™ سوڊيم سائانائيڊ NaCN (≥98.3٪) supplies leaching at 18 ايم في ظرف. آو ڪارب ™ گولڊ ريڪوري ناريل شيل چالو ڪاربن (≥99٪ سختي) is specified differently for column and agitated service at 15 ايم في ظرف. AuLeach™ گولڊ ليچنگ ايجنٽ (GDA) - غير خطرناڪ جتي اجازت هجي اتي جائزو ورتو ويندو آهي 28 ايمسڀ بيچ سان گڏ موڪليو ويو ڪوئ, TDS ۽ MSDS in 25 ڪلوگرام هيوي ڊيوٽي ليمينيٽڊ پي اي بيگز هيٺ FOB / CIF شرطون.

3b. Ramp-up is where carbon is lost

A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.

3c. Ramp-up is where carbon is lost

A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.

5. سوال

Q1 — What did EMAS report?

US$43 million EBITDA with gold production up 69% quarter on quarter.

Q2 — What is Pani's resource?

7.0 million ounces of gold with an estimated 15-year mine life.

Q3 — What is planned for 2028?

A CIL facility scaling to 12 Mt/y by 2029.

Q4 — Does carbon spec change between stages?

Yes — column service favours activity; CIL favours hardness and low attrition.

سوال 5 — ڪهڙا شرط موجود آهن؟

بيچ COA، TDS ۽ MSDS سان FOB يا CIF.

Q6 — Can carbon be tested first?

Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.

Qualify stage two during stage one

Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.

اسان سان رابطو ڪريو · BC1100 · گولڊن ٽرائنگل جو جائزو · انڊسٽري نيوز

واٽس ايپ +86 173 9270 5576 · info@unitedchemicalcn.com

Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.

  • بي ترتيب مواد
  • گرم مواد
  • گرم جائزو مواد

توهان کي به پسند ڪري سگھي ٿو

آن لائن پيغام صلاح

تبصرو شامل ڪريو:

8617392705576 +WhatsApp QR ڪوڊڪوڊ ڪوڊ اسڪين
صلاح مشوري لاءِ پيغام ڇڏيو
توهان جي پيغام لاءِ مهرباني، اسان جلد توهان سان رابطو ڪنداسين!
درج ڪريو