
UNITED CHEMICAL · ВЕСТИ ИЗ ИНДУСТРИЈЕ · 27. НОВЕМБАР 2026.
More gold, higher costs, narrower margin
Two records landed in the same quarter. That is not a coincidence.
World mine production rose 3% to 1,070.9 tonnes in Q3 2026, the highest third-quarter figure in a series dating to 2000, according to the World Gold Council's Gold Demand Trends report published 3 November and reported by Beleevid. In the same period, all-in sustaining costs reached a record US$1,930 an ounce in Q2, up 22% year on year — the steepest annual increase since early 2013. Separately, i-80 Gold announced on 23 November that it had mined first gold and commenced production mining at its Archimedes underground project in Nevada, its second underground mine to come online.
1. Why record output and record cost fit together
Lower-grade ore is the connecting thread. The council attributed the 7% year-on-year fall in US output to lower-grade mining at several operations including Nevada Gold Mines and Kinross's Round Mountain. When grade falls, each ounce requires more tonnes through the plant, more energy, more labour and more reagent. Output can still set records while unit cost climbs, because the industry is working harder for each ounce.
2. The regional picture
| област | Reported move | Reagent reading |
|---|---|---|
| Kanada | +22% излаз | Rising consumables demand |
| Сједињене Америчке Државе | −7% output | Grade-driven cost pressure |
| Australija | −12% output | Portfolio re-sequencing |
| Indonesia / Chile / Ghana | Повећава се | New qualification work |
Златни троугао — три производа, један добављач
AuCyan™ натријум цијанид NaCN (≥98.3%) · AuCarb™ активни угаљ из љуске кокоса за опоравак злата (тврдоћа ≥99%) · AuLeach™ средство за излучивање злата (GDA) – неопасно
3. Worked check: grade, tonnes and reagent
If head grade falls from 2.0 g/t to 1.6 g/t while the plant holds 100,000 ounces a year, throughput must rise by 25%. At a цијанид demand of 0.25 kg/t and Угљеник make-up of 0.05 kg/t, annual cyanide rises from roughly 312 t to 390 t and carbon from 62 t to 78 t — before any change in recovery. A one-percentage-point recovery loss on the same ore adds a further loss of about 1,000 ounces a year. This is why efficiency, not unit price, sets the margin when AISC is at a record.
Grade 2.0 → 1.6 g/t: throughput +25%
цијанид: ≈ 312 t → 390 t/year
4. Where the three products fit
AuCyan™ натријум цијанид NaCN (≥98.3%) protects the leach setpoint through a defined dissolution profile. AuCarb™ активни угаљ од кокосове љуске за регенерацију злата (тврдоћа ≥99%) reduces gold-bearing fines through ball-pan hardness ≥99% and AARL attrition ≤1.5%. AuLeach™ средство за излучивање злата (GDA) – неопасно offers an alternative route where permitted. All ship with batch КП, ТД МСДС под ФОБ/ЦИФ terms, in 25 кг тешке ламиниране ПЕ вреће.
3b. Two secondary signals worth reading
The council reported that recycled gold fell 8% to 314.5 tonnes, the lowest quarterly total since Q4 2023, even though the average gold price was 23% above a year earlier. It also reported net producer hedging of negative 16.8 tonnes, an eleventh consecutive quarterly decline, with the outstanding hedge book expected to fall from 109 tonnes to about 92 tonnes. Both signals point the same way: the market is drawing supply from mine production and from existing inventories rather than from new recycling, while producers are deliberately leaving more exposure unhedged. For a consumables supplier, the implication is that mine output reliability carries more weight than in a hedged market. A recovery loss caused by poor carbon or unstable cyanide dosing cannot be offset by a hedging gain that no longer exists.
4b. Reading the secondary supply signals
Two figures in the council report deserve a second look. Recycled gold fell 8% to 314.5 tonnes, the lowest quarterly total since the fourth quarter of 2023, even though the average gold price was 23% above a year earlier. Net producer hedging was negative 16.8 tonnes, an eleventh consecutive quarterly decline, and the outstanding hedge book was expected to fall from 109 tonnes to about 92 tonnes. Both signals point the same way: the market is drawing supply from mine production and existing inventories rather than from fresh recycling, while producers are choosing to leave more price exposure unhedged. For a consumables supplier the implication is direct. In a hedged market a recovery loss could be partly offset by a financial position; in an unhedged one it cannot. Mine output reliability and reagent efficiency therefore carry more weight in the operating result than they did a decade ago.
КСНУМКС. ФАК
Q1 — What did the WGC report?
Q3 mine production of 1,070.9 tonnes, a record for the quarter, and record AISC of US$1,930/oz in Q2.
Q2 — Why did US output fall?
Lower-grade mining at several operations.
Q3 — What did i-80 announce?
First gold and production mining at Archimedes underground in Nevada, on 23 November 2026.
Q4 — How does falling grade affect reagents?
More tonnes per ounce means proportionally more cyanide and carbon.
Q5 — What terms are available?
FOB or CIF, batch COA/TDS/MSDS, MOQ 1×20' FCL.
Q6 — How many countries do you serve?
Више од 77.
Benchmark your cost per ounce
Send grade, throughput and recovery. We return a reagent-efficiency model in cost per recovered ounce.
Контактирајте нас · Преглед Златног троугла · Честа питања о хемикалијама · Вести из индустрије
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Sources: World Gold Council Gold Demand Trends Q3 2026 (3 November), via Beleevid; i-80 Gold press release, 23 November 2026.
- Случајни садржај
- Врући садржај
- Врући садржај рецензије
- Индустријска класа Електронски разред 98% сумпорна киселина Х2СО4 сумпорна киселина Батеријска киселина Индустријска сумпорна киселина
- Индустријска концентрована азотна киселина 55%-68%
- Сеизмички електрични детонатор (антистатички, отпорност на воду)
- Калцијум пероксид 60% тест жућкаста таблета
- Да ли флотацијски реагенси утичу на животну средину?
- 1Снижени натријум цијанид (ЦАС: 143-33-9) за рударство – висок квалитет и конкурентне цене
- 2Натријум цијанид 98.3% CAS 143-33-9 NaCN златно средство за прераду, неопходно за рударску хемијску индустрију
- 3Кинески нови прописи о извозу натријум цијанида и упутства за међународне купце
- 4Натријум цијанид (ЦАС: 143-33-9) Сертификат крајњег корисника (кинеска и енглеска верзија)
- 5Међународни кодекс управљања цијанидом (натријум цијанид) - Стандарди прихватања рудника злата
- 6Кина фабрика сумпорна киселина 98%
- 7Анхидрована оксална киселина 99.6% индустријског квалитета
- 1Натријум цијанид 98.3% CAS 143-33-9 NaCN златно средство за прераду, неопходно за рударску хемијску индустрију
- 2Висока чистоћа · Стабилне перформансе · Већи опоравак — натријум цијанид за модерно излучивање злата
- 3United ChemicalИстраживачки тим показује ауторитет кроз увиде засноване на подацима
- 4AuCyan™ високо ефикасни натријум цијанид | Чистоћа 98.3% за глобално рударство злата
- 5Дигитални електронски детонатор (време кашњења 0~16000мс)
- 6Детонатор ударне цеви високе чврстоће, високе прецизности
- 7индустрија Електрични детонатор










Онлине консултације за поруке
Додај коментар: