Як ғайри-cyanide route is a commercial decision, not a label

Peak recovery is the least important number in the decision.

Operations compare a leaching agent on peak recovery and stop there. The operating cost is actually set by pH, dosage and solution chemistry moving together. Агенти шустагарии тиллои AuLeach™ (GDA) – Бехатар ҳамчун маводи кимиёвии маъмулӣ киштӣ мешавад ва дар он истифода мешавад Шусташавии теппа ва Шусташавии андоз аз арзиши иловашуда circuits where permissible cyanide use is constrained or supply chains are long. This guide sets out when the route pays and how to find out with a week of test work.

1. Three situations that favour the route

First, jurisdictions where cyanide permitting is constrained. Second, sites far from licensed cyanide supply chains. Third, ores where cyanide demand is uneconomic because of copper-bearing minerals. In each case the decision must be made on test work, not assumption.

Where cyanide remains the preferred route, Сианиди натрий AuCyan™ NaCN (≥98.3%) is the reference reagent. The two routes are complementary; a technical team should be able to model both from the same ore sample.

2. Bottle-roll design

Use 1 kg of pulverised ore at 40% solids, three dosage levels plus a control, sampled at 2, 6, 12 and 24 hours. Record gold extraction, reagent consumption and pH drift at every point. The curve shape tells you whether the circuit is reagent-limited or kinetics-limited. If extraction plateaus early, more reagent buys nothing. If it is still climbing at 24 hours, contact time is the constraint.

ТағйирёбандадиапазонАён мешавад
Қисмҳои сахт35 - 45%Contact efficiency
ИстфодаПаст / миёна / баландМиқдори иқтисодӣ
pHБанди мушаххаси сайтТирезаи устуворӣ
Time2 / 6 / 12 / 24 соатКаҷхати кинетикӣ

3. Worked comparison: recovery versus cost per ounce

Suppose bottle rolls show 82% extraction with conventional cyanidation at 0.30 kg/t demand, and 74% with the non-cyanide route at 0.45 kg/t. On a 2,000 t/day ore at 1.5 g/t, the conventional route recovers 2,460 g/day of gold and the alternative 2,220 g/day — a 240 g/day difference. At US$3,550/oz that is roughly US$27,000/day of revenue. The reagent saving would have to exceed that to justify the switch. In a jurisdiction where cyanide permitting is constrained, the comparison changes because the alternative route is the only route available.

Анъанавӣ: 82% at 0.30 kg/t

Non-cyanide: 74% at 0.45 kg/t

Recovery gap: ≈ 240 g/day ≈ US$27,000/day

4. pH is the master variable

pH governs reagent stability, gold surface chemistry and the behaviour of interfering species. Establish a site-specific setpoint from bottle-roll work and hold it with automatic control. In a Шусташавии андоз аз арзиши иловашуда circuit, log pH at top, middle and bottom of each vat to detect stratification. Drift outside the agreed band shows up first as slower extraction, then as higher consumption.

5. Миқдори тақсимшуда ва зонуи каҷ

If the first half of the dose delivers 80% of extraction and the second half delivers 4%, the second half is buying inventory, not recovery. Split dosing with measurement lets you stop at the knee. On 2,000 t/day, trimming an unproductive 0.15 kg/t saves about 300 kg/day, roughly 110 t/year, with no change in gold output. The same discipline applies to free cyanide in a conventional circuit.

6. Heap and vat commissioning

барои Шусташавии теппа, run column tests on each ore domain, control irrigation-solution pH and split the dose across irrigation stages. For Шусташавии андоз аз арзиши иловашуда, run bottle rolls, control vat solution pH and split the dose across leach cycles. In both cases dissolved gold is recovered on Карбони фаъолшудаи пӯсти кокоси тиллоии AuCarb™ (сахтии ≥99%) selected on K and R values from the same test programme, typically in Карбон дар сутун service for clarified heap solutions.

7. Таъминот ва ҳуҷҷатгузорӣ

AuLeach™ GDA ships as a common chemical with batch COA, ТДС ва MSDS, ки дар Халтаҳои ламинатшудаи PE бо сифати баланд ва 25 кгMOQ аст. 1×20' FCL ≈ 28 MT назди FOB/CIF шартҳои. United Chemical ба зиёда аз 77 кишвар хизмат мерасонад. Намунаҳои ройгони AuLeach™ ва AuCarb™ пеш аз таҳвили тиҷоратӣ барои озмоиши мустақили лабораторӣ дастрасанд.

8. Саволҳои зиёд такрормешуда

С1 — Оё ин системаи бе сианид аст?

Бале. AuLeach™ GDA як агенти шустагарии тиллои бе сианид аст, ки ҳамчун як маводи кимиёвии маъмулӣ пешниҳод карда мешавад.

Q2 — Do I need to rebuild the circuit?

Typically no; it is designed for existing Heap leaching and Vat leaching circuits, subject to test work.

Q3 — How is it described for handling?

As Non-Hazardous, with a batch COA, TDS and MSDS.

С4 — Чӣ тавр ман бояд миқдорро интихоб кунам?

From a three-level bottle-roll programme, stopping at the knee of the curve.

С5 — MOQ ва шартҳо чист?

1×20' FCL ≈ 28 MT, FOB ё CIF.

Q6 — Can gold be recovered on карбон?

Yes — AuCarb™ carbon in Carbon-in-Column or Carbon-in-Pulp service.

Run the route comparison

Send ore grade, pH data and circuit configuration. We return a bottle-roll protocol, a dosing curve and a landed-cost estimate.

Тамос бо мо · Реагентҳои шустагарӣ · Шарҳи мухтасари се маҳсулот · Саволҳои зуд-зуд додашаванда дар бораи кимиёвӣ · Хабарҳои саноатӣ

WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

  • Мундариҷаи тасодуфӣ
  • Мазмуни гарм
  • Мазмуни баррасии гарм

Шумо инчунин метавонед ба мисли

Машварати паёмҳои онлайн

Иловаи шарҳ:

8617392705576 +Коди QR WhatsAppРамзи QR -ро скан кунед
Барои машварат паём гузоред
Ташаккур барои паёми шумо, мо ба зудӣ бо шумо тамос хоҳем гирифт!
Садо