A restart bounded by stockpiles and by safety
Processing existing ore is not the same as returning to full mining.
Anagold Mining has restarted the Çöpler gold mine in eastern Türkiye under a temporary operating licence, processing stockpiled ore and targeting about 1.3 tonnes of gold by the end of 2026, according to Europe Mining News. The mine produced about 6.9 tonnes in 2023, roughly one-fifth of Türkiye's gold output. Its suspension followed a heap leach pad failure in February 2024 that killed nine workers and injured two. Turkish conglomerate Cengiz Holding bought SSR Mining's 80% stake earlier in 2026 for US$1.49 billion.
1. What a stockpile-only restart means technically
Existing stockpiled ore has a known grade and a known exposure history. That makes the metallurgical task narrower than a fresh mine start: the leach circuit can be calibrated against material that has already been characterised. In a ہیپ لیچنگ operation, gold from the pad is recovered from pregnant solution, typically in کاربن ان کالم (CIC) service. Solution clarity and کاربن loading rate dominate; hardness matters less than in an agitated tank but still governs handling losses.
2. The licence boundary
The reporting is explicit that the current phase is restricted to existing stockpiles rather than a full return to mining. Any move beyond that depends on permanent permitting and on the views of regulators, local communities and the courts on the site's safety record. A seismic study found the slope had been deforming for at least four years before failure, and an independent review linked the collapse to a third-party design flaw. For a supplier, this is a clear boundary: supply planning should track the licence scope, not assume a full restart.
سنہری مثلث - تین مصنوعات، ایک سپلائر
AuCyan™ Sodium Cyanide NaCN (≥98.3%) · AuCarb™ گولڈ ریکوری کوکونٹ شیل ایکٹیویٹڈ کاربن (≥99% سختی) · AuLeach™ گولڈ لیچنگ ایجنٹ (GDA) – غیر مؤثر
3. Worked volume check
A target of 1.3 tonnes of gold by year-end is roughly 41,800 ounces. If the stockpile leach circuit runs at 80% recovery, the contained gold processed is about 52,000 ounces. At a carbon loading of 2,000 g/t on loaded carbon, that implies around 26 tonnes of loaded carbon over the campaign — a figure that sets the handling and elution schedule. Exact values depend on site data; the method is what matters for planning a bounded restart.
ہدف: 1.3 t ≈ 41,800 oz
Indicative loaded carbon: ≈ 26 t at 2,000 g/t
4. Reagent fit for a bounded restart
For column service, BC1100 class carbon is the usual evaluation starting point, selected on K and R values measured with site solution. AuCyan™ Sodium Cyanide NaCN (≥98.3%) ships under licensed import at 18 MT فی کنٹینر AuLeach™ گولڈ لیچنگ ایجنٹ (GDA) – غیر مؤثر جائزہ لیا جاتا ہے جہاں اجازت ہے۔ 28 MT. بیچ کے ساتھ تمام جہاز COA, TDS اور MSDS in 25 کلوگرام ہیوی ڈیوٹی لیمینیٹڈ PE بیگ کے تحت ایف او بی/سی آئی ایف شرائط
3b. Stockpile oxidation and leach kinetics
Stockpiled ore is not fresh ore. Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites, and log solution grade curves rather than relying on historical recovery figures. For a ہیپ لیچنگ circuit, irrigation rate and solution pH are the two operational levers; for کاربن ان کالم recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less — every tonne processed has to earn its place in a bounded campaign.
3c. Stockpiles are not fresh ore
Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites and log solution grade curves rather than relying on historical recovery figures. For a ہیپ لیچنگ circuit, irrigation rate and solution pH are the two operational levers; for کاربن ان کالم recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less: every tonne processed has to earn its place in a bounded campaign.
5 عمومی سوالات
Q1 — What restarted at Çöpler?
Processing of stockpiled ore under a temporary operating licence.
Q2 — What is the target?
About 1.3 tonnes of gold by the end of 2026.
Q3 — Is full mining resumed?
No — the current phase is limited to existing stockpiles.
Q4 — Which recovery route applies?
Heap leaching with carbon-in-column recovery from pregnant solution.
Q5 - کون سی شرائط دستیاب ہیں؟
بیچ COA، TDS اور MSDS کے ساتھ FOB یا CIF۔
Q6 — Do you serve West Asia?
Yes — more than 77 countries including West Asian markets.
Plan supply to the licence scope
Send your stockpile grade and recovery route. We return a column-service carbon and reagent dossier.
ہم سے رابطہ کریں · AuCarb™ گائیڈ · کیمیائی عمومی سوالنامہ · صنعت کی خبریں۔
واٹس ایپ +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Europe Mining News, November 2026, reporting on the Çöpler stockpile restart.
- بے ترتیب مواد
- گرم مواد
- گرم جائزہ مواد
- صنعتی گریڈ سوڈیم ہیکسامیٹا فاسفیٹ 68% SHMP
- پوٹاشیم پرمینگیٹ - صنعتی گریڈ
- میں صحیح flocculant کا انتخاب کیسے کروں؟
- میں ایسک پروسیسنگ میں کیمیکلز کے استعمال کو کیسے بہتر بنا سکتا ہوں؟
- سلفیمک ایسڈ
- 1کان کنی کے لیے رعایتی سوڈیم سائینائیڈ (CAS: 143-33-9) - اعلیٰ معیار اور مسابقتی قیمت
- 2سوڈیم سائنائیڈ 98.3% CAS 143-33-9 NaCN گولڈ ڈریسنگ ایجنٹ کان کنی کیمیکل انڈسٹریز کے لیے ضروری
- 3سوڈیم سائینائیڈ کی برآمدات پر چین کے نئے ضوابط اور بین الاقوامی خریداروں کے لیے رہنمائی
- 4سوڈیم سائینائیڈ (CAS: 143-33-9) اختتامی صارف کا سرٹیفکیٹ (چینی اور انگریزی ورژن)
- 5بین الاقوامی سائینائیڈ (سوڈیم سائینائیڈ) مینجمنٹ کوڈ - گولڈ مائن قبولیت کے معیارات
- 6چین فیکٹری سلفرک ایسڈ 98%
- 7اینہائیڈروس آکسالک ایسڈ 99.6% صنعتی گریڈ
- 1سوڈیم سائنائیڈ 98.3% CAS 143-33-9 NaCN گولڈ ڈریسنگ ایجنٹ کان کنی کیمیکل انڈسٹریز کے لیے ضروری
- 2اعلیٰ طہارت · مستحکم کارکردگی · اعلیٰ بحالی - جدید سونے کے لیچنگ کے لیے سوڈیم سائینائیڈ
- 3United Chemicalکی ریسرچ ٹیم ڈیٹا سے چلنے والی بصیرت کے ذریعے اتھارٹی کا مظاہرہ کرتی ہے۔
- 4AuCyan™ ہائی پرفارمنس سوڈیم سائنائیڈ | عالمی سونے کی کان کنی کے لیے 98.3% پاکیزگی
- 5ڈیجیٹل الیکٹرانک ڈیٹونیٹر (تاخیر کا وقت 0 ~ 16000ms)
- 6اعلی طاقت، اعلی صحت سے متعلق شاک ٹیوب ڈیٹونیٹر
- 7انڈسٹری الیکٹرک ڈیٹونیٹر










آن لائن پیغام مشاورت
تبصرہ شامل کریں: