
UNITED CHEMICAL · XOV XWM TXOG KEV LAG LUAM · 27 LUB KAUM IB HLIS 2026
A restart bounded by stockpiles and by safety
Processing existing ore is not the same as returning to full mining.
Anagold Mining has restarted the Çöpler gold mine in eastern Türkiye under a temporary operating licence, processing stockpiled ore and targeting about 1.3 tonnes of gold by the end of 2026, according to Europe Mining News. The mine produced about 6.9 tonnes in 2023, roughly one-fifth of Türkiye's gold output. Its suspension followed a heap leach pad failure in February 2024 that killed nine workers and injured two. Turkish conglomerate Cengiz Holding bought SSR Mining's 80% stake earlier in 2026 for US$1.49 billion.
1. What a stockpile-only restart means technically
Existing stockpiled ore has a known grade and a known exposure history. That makes the metallurgical task narrower than a fresh mine start: the leach circuit can be calibrated against material that has already been characterised. In a Heap leaching operation, gold from the pad is recovered from pregnant solution, typically in Carbon-hauv-Column (CIC) service. Solution clarity and carbon loading rate dominate; hardness matters less than in an agitated tank but still governs handling losses.
2. The licence boundary
The reporting is explicit that the current phase is restricted to existing stockpiles rather than a full return to mining. Any move beyond that depends on permanent permitting and on the views of regulators, local communities and the courts on the site's safety record. A seismic study found the slope had been deforming for at least four years before failure, and an independent review linked the collapse to a third-party design flaw. For a supplier, this is a clear boundary: supply planning should track the licence scope, not assume a full restart.
Lub Peb Caug Kub — peb yam khoom, ib tus neeg muag khoom
AuCyan™ Sodium Cyanide NaCN (≥98.3%) · AuCarb™ Kub Rov Qab Tau Cov Roj Carbon Ua Los Ntawm Txiv maj phaub (≥99% Hardness) · AuLeach™ Kub Leaching Agent (GDA) – Tsis Muaj Kev Phom Sij
3. Worked volume check
A target of 1.3 tonnes of gold by year-end is roughly 41,800 ounces. If the stockpile leach circuit runs at 80% recovery, the contained gold processed is about 52,000 ounces. At a carbon loading of 2,000 g/t on loaded carbon, that implies around 26 tonnes of loaded carbon over the campaign — a figure that sets the handling and elution schedule. Exact values depend on site data; the method is what matters for planning a bounded restart.
Hom phiaj: 1.3 t ≈ 41,800 oz
Indicative loaded carbon: ≈ 26 t at 2,000 g/t
4. Reagent fit for a bounded restart
For column service, BC1100 class carbon is the usual evaluation starting point, selected on K and R values measured with site solution. AuCyan™ Sodium Cyanide NaCN (≥98.3%) ships under licensed import at 18 MT rau lub thawv. AuLeach™ Tus Neeg Tshuaj Ntxuav Kub (GDA) - Tsis Muaj Kev Phom Sij is evaluated where permitted at 28 MT. All ship with batch COA, TDS thiab MSDS in 25 kg cov hnab PE laminated hnyav nyob rau hauv FOB / CIF cov ntsiab lus uas.
3b. Stockpile oxidation and leach kinetics
Stockpiled ore is not fresh ore. Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites, and log solution grade curves rather than relying on historical recovery figures. For a Heap leaching circuit, irrigation rate and solution pH are the two operational levers; for Carbon-hauv-Column recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less — every tonne processed has to earn its place in a bounded campaign.
3c. Stockpiles are not fresh ore
Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites and log solution grade curves rather than relying on historical recovery figures. For a Heap leaching circuit, irrigation rate and solution pH are the two operational levers; for Carbon-hauv-Column recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less: every tonne processed has to earn its place in a bounded campaign.
5. Cov FAQ
Q1 — What restarted at Çöpler?
Processing of stockpiled ore under a temporary operating licence.
Q2 — What is the target?
About 1.3 tonnes of gold by the end of 2026.
Q3 — Is full mining resumed?
No — the current phase is limited to existing stockpiles.
Q4 — Which recovery route applies?
Heap leaching with carbon-in-column recovery from pregnant solution.
Q5 — Cov nqe lus twg muaj?
FOB or CIF with batch COA, TDS and MSDS.
Q6 — Do you serve West Asia?
Yes — more than 77 countries including West Asian markets.
Plan supply to the licence scope
Send your stockpile grade and recovery route. We return a column-service carbon and reagent dossier.
Hu Rau Peb · AuCarb™ phau ntawv qhia · Tshuaj FAQs · Kev lag luam xov xwm
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Europe Mining News, November 2026, reporting on the Çöpler stockpile restart.
- Random Cov ntsiab lus
- Cov ntsiab lus kub
- Kub tshuaj xyuas cov ntsiab lus
- Muaj qib sodium hexametaphosphate 68% SHMP
- Potassium Permanganate - Qib Industrial
- Kuv yuav xaiv txoj cai flocculant li cas?
- Kuv tuaj yeem ua kom zoo rau kev siv tshuaj hauv kev ua ore li cas?
- Sulfamic acid
- 1Kev txo nqi Sodium Cyanide (CAS: 143-33-9) rau Mining - Siab Zoo & Tus nqi sib tw
- 2Sodium Cyanide 98.3% CAS 143-33-9 NaCN kub hnav khaub ncaws tus neeg sawv cev tseem ceeb rau kev tsuas tshuaj lom neeg kev lag luam
- 3Tuam Tshoj Txoj Cai Tshiab ntawm Sodium Cyanide Exports thiab Kev taw qhia rau cov neeg yuav khoom thoob ntiaj teb
- 4Sodium Cyanide (CAS: 143-33-9) End user certificate (Suav thiab Askiv version)
- 5International Cyanide (Sodium cyanide) Kev Tswj Xyuas Txoj Cai - Kub Mine Txais Cov Qauv
- 6Tuam Tshoj Hoobkas Sulfuric Acid 98%
- 7Anhydrous Oxalic acid 99.6% Muaj Qib
- 1Sodium Cyanide 98.3% CAS 143-33-9 NaCN kub hnav khaub ncaws tus neeg sawv cev tseem ceeb rau kev tsuas tshuaj lom neeg kev lag luam
- 2High Purity · Kev Ua Haujlwm ruaj khov · Kev Txhim Kho Siab dua - sodium cyanide rau niaj hnub kub leaching
- 3United ChemicalPab Pawg Tshawb Fawb Qhia Txog Txoj Cai Los Ntawm Cov Ntaub Ntawv-Driven Insights
- 4AuCyan™ Kev Ua Haujlwm Siab Sodium Cyanide | 98.3% Kev Huv Si rau Kev Khawb Kub Thoob Ntiaj Teb
- 5Digital Electronic Detonator (Lub sijhawm ncua 0 ~ 16000ms)
- 6High-strength, High-precision Shock Tube Detonator
- 7Kev lag luam Electric Detonator










Kev sib tham hauv online
Ntxiv lus: