
UNITED CHEMICAL · ȘTIRI DIN INDUSTRIE · 27 NOIEMBRIE 2026
A restart bounded by stockpiles and by safety
Processing existing ore is not the same as returning to full mining.
Anagold Mining has restarted the Çöpler gold mine in eastern Türkiye under a temporary operating licence, processing stockpiled ore and targeting about 1.3 tonnes of gold by the end of 2026, according to Europe Mining News. The mine produced about 6.9 tonnes in 2023, roughly one-fifth of Türkiye's gold output. Its suspension followed a heap leach pad failure in February 2024 that killed nine workers and injured two. Turkish conglomerate Cengiz Holding bought SSR Mining's 80% stake earlier in 2026 for US$1.49 billion.
1. What a stockpile-only restart means technically
Existing stockpiled ore has a known grade and a known exposure history. That makes the metallurgical task narrower than a fresh mine start: the leach circuit can be calibrated against material that has already been characterised. In a Leşierea în grămada operation, gold from the pad is recovered from pregnant solution, typically in Carbon în coloană (CIC) service. Solution clarity and Carbon loading rate dominate; hardness matters less than in an agitated tank but still governs handling losses.
2. The licence boundary
The reporting is explicit that the current phase is restricted to existing stockpiles rather than a full return to mining. Any move beyond that depends on permanent permitting and on the views of regulators, local communities and the courts on the site's safety record. A seismic study found the slope had been deforming for at least four years before failure, and an independent review linked the collapse to a third-party design flaw. For a supplier, this is a clear boundary: supply planning should track the licence scope, not assume a full restart.
Triunghiul de Aur — trei produse, un furnizor
AuCyan™ Cianură de sodiu NaCN (≥98.3%) · AuCarb™ Cărbune activ din coajă de cocos pentru recuperarea aurului (duritate ≥99%) · AuLeach™ Agent de levigare aur (GDA) – Nepericulos
3. Worked volume check
A target of 1.3 tonnes of gold by year-end is roughly 41,800 ounces. If the stockpile leach circuit runs at 80% recovery, the contained gold processed is about 52,000 ounces. At a carbon loading of 2,000 g/t on loaded carbon, that implies around 26 tonnes of loaded carbon over the campaign — a figure that sets the handling and elution schedule. Exact values depend on site data; the method is what matters for planning a bounded restart.
Ţintă: 1.3 t ≈ 41,800 oz
Indicative loaded carbon: ≈ 26 t at 2,000 g/t
4. Reagent fit for a bounded restart
For column service, BC1100 class carbon is the usual evaluation starting point, selected on K and R values measured with site solution. Cianură de sodiu AuCyan™ NaCN (≥98.3%) ships under licensed import at 18 MT pe container. Agent de levigare a aurului (GDA) AuLeach™ – Nepericulos is evaluated where permitted at 28 MT. All ship with batch COA, TDS și MSDS in Saci PE laminati rezistenți de 25 kg în FOB/CIF termeni.
3b. Stockpile oxidation and leach kinetics
Stockpiled ore is not fresh ore. Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites, and log solution grade curves rather than relying on historical recovery figures. For a Leşierea în grămada circuit, irrigation rate and solution pH are the two operational levers; for Carbon în coloană recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less — every tonne processed has to earn its place in a bounded campaign.
3c. Stockpiles are not fresh ore
Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites and log solution grade curves rather than relying on historical recovery figures. For a Leşierea în grămada circuit, irrigation rate and solution pH are the two operational levers; for Carbon în coloană recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less: every tonne processed has to earn its place in a bounded campaign.
5. FAQ
Q1 — What restarted at Çöpler?
Processing of stockpiled ore under a temporary operating licence.
Q2 — What is the target?
About 1.3 tonnes of gold by the end of 2026.
Q3 — Is full mining resumed?
No — the current phase is limited to existing stockpiles.
Q4 — Which recovery route applies?
Heap leaching with carbon-in-column recovery from pregnant solution.
Q5 — What terms are available?
FOB or CIF with batch COA, TDS and MSDS.
Q6 — Do you serve West Asia?
Yes — more than 77 countries including West Asian markets.
Plan supply to the licence scope
Send your stockpile grade and recovery route. We return a column-service carbon and reagent dossier.
Contactează-ne · Ghidul AuCarb™ · Întrebări frecvente despre chimicale · industria de știri
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Europe Mining News, November 2026, reporting on the Çöpler stockpile restart.
- Conținut aleatoriu
- Conținut fierbinte
- Conținut fierbinte de recenzii
- Hexametafosfat de sodiu de calitate industrială 68% SHMP
- Permanganat de potasiu – calitate industrială
- Cum aleg floculantul potrivit?
- Cum pot optimiza utilizarea substanțelor chimice în prelucrarea minereului?
- Acid sulfamic
- 1Cianură de sodiu cu reducere (CAS: 143-33-9) pentru minerit - Calitate înaltă și prețuri competitive
- 2Cianură de sodiu 98.3% CAS 143-33-9 NaCN agent de finisare a aurului esențial pentru industria chimică minieră
- 3Noile reglementări ale Chinei privind exporturile de cianură de sodiu și îndrumări pentru cumpărătorii internaționali
- 4Cianură de sodiu (CAS: 143-33-9) Certificat de utilizator final (versiunea chineză și engleză)
- 5Cianură internațională (cianura de sodiu) Cod de management - Standarde de acceptare pentru mine de aur
- 6Fabrica din China Acid sulfuric 98%
- 7Acid oxalic anhidru 99.6% grad industrial
- 1Cianură de sodiu 98.3% CAS 143-33-9 NaCN agent de finisare a aurului esențial pentru industria chimică minieră
- 2Puritate ridicată · Performanță stabilă · Recuperare mai mare — cianură de sodiu pentru levigarea modernă a aurului
- 3United ChemicalEchipa de cercetare demonstrează autoritate prin intermediul informațiilor bazate pe date
- 4Cianură de sodiu de înaltă performanță AuCyan™ | Puritate 98.3% pentru mineritul aurului la nivel global
- 5Detonator electronic digital (Timp de întârziere 0 ~ 16000 ms)
- 6Detonator cu tub de șoc de înaltă rezistență, de înaltă precizie
- 7industrie Detonator electric










Consultare mesaj online
Adauga comentariu: