A heap-leach ramp, then a CIL plant
Two processing routes on one site means two qualification programmes.
PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.
1. Stage one: heap leaching at 8 Mt/y
A heap-leach facility at this scale is a Carbon-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 este nota evaluată de obicei pentru coloană și Leşierea în grămada service, selected on K and R values measured with the site's own solution.
2. Stage two: CIL from 2028
The company plans to develop a Carbon-în-Leach (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.
Triunghiul de Aur — trei produse, un furnizor
AuCyan™ Cianură de sodiu NaCN (≥98.3%) · AuCarb™ Cărbune activ din coajă de cocos pentru recuperarea aurului (duritate ≥99%) · AuLeach™ Agent de levigare aur (GDA) – Nepericulos
3. Worked scale check
At 8 million tonnes a year through the heap leach, a cianură demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.
Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year
CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year
4. Product fit across both stages
Cianură de sodiu AuCyan™ NaCN (≥98.3%) supplies leaching at 18 MT pe container. Cărbune activ din coajă de cocos AuCarb™ Gold Recovery (duritate ≥99%) is specified differently for column and agitated service at 15 MT pe container. Agent de levigare a aurului (GDA) AuLeach™ – Nepericulos este evaluat acolo unde este permis la 28 MTToate sunt expediate cu lot COA, TDS și MSDS in Saci PE laminati rezistenți de 25 kg în FOB/CIF termeni.
3b. Ramp-up is where carbon is lost
A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.
3c. Ramp-up is where carbon is lost
A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.
5. FAQ
Q1 — What did EMAS report?
US$43 million EBITDA with gold production up 69% quarter on quarter.
Q2 — What is Pani's resource?
7.0 million ounces of gold with an estimated 15-year mine life.
Q3 — What is planned for 2028?
A CIL facility scaling to 12 Mt/y by 2029.
Q4 — Does carbon spec change between stages?
Yes — column service favours activity; CIL favours hardness and low attrition.
Î5 — Ce termeni sunt disponibili?
FOB sau CIF cu COA, TDS și MSDS pentru lot.
Q6 — Can carbon be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.
Qualify stage two during stage one
Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.
Contactează-ne · BC1100 · Prezentare generală a Triunghiului de Aur · industria de știri
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.
- Conținut aleatoriu
- Conținut fierbinte
- Conținut fierbinte de recenzii
- CERTIFICAT DE SISTEM DE MANAGEMENT DE MEDIU
- Acid oxalic pentru minerit 99.6%
- Exploziv AN extins
- Sodiu metalic, ≥99.7%
- Bisulfit de sodiu 99% Aprovizionare din fabrică de înaltă calitate
- 1Cianură de sodiu cu reducere (CAS: 143-33-9) pentru minerit - Calitate înaltă și prețuri competitive
- 2Cianură de sodiu 98.3% CAS 143-33-9 NaCN agent de finisare a aurului esențial pentru industria chimică minieră
- 3Noile reglementări ale Chinei privind exporturile de cianură de sodiu și îndrumări pentru cumpărătorii internaționali
- 4Cianură de sodiu (CAS: 143-33-9) Certificat de utilizator final (versiunea chineză și engleză)
- 5Cianură internațională (cianura de sodiu) Cod de management - Standarde de acceptare pentru mine de aur
- 6Fabrica din China Acid sulfuric 98%
- 7Acid oxalic anhidru 99.6% grad industrial
- 1Cianură de sodiu 98.3% CAS 143-33-9 NaCN agent de finisare a aurului esențial pentru industria chimică minieră
- 2Puritate ridicată · Performanță stabilă · Recuperare mai mare — cianură de sodiu pentru levigarea modernă a aurului
- 3United ChemicalEchipa de cercetare demonstrează autoritate prin intermediul informațiilor bazate pe date
- 4Cianură de sodiu de înaltă performanță AuCyan™ | Puritate 98.3% pentru mineritul aurului la nivel global
- 5Detonator electronic digital (Timp de întârziere 0 ~ 16000 ms)
- 6Detonator cu tub de șoc de înaltă rezistență, de înaltă precizie
- 7industrie Detonator electric










Consultare mesaj online
Adauga comentariu: