UNITED CHEMICAL · 行业新闻 · 2026年11月27日
A restart bounded by stockpiles and by safety
Processing existing ore is not the same as returning to full mining.
Anagold Mining has restarted the Çöpler gold mine in eastern Türkiye under a temporary operating licence, processing stockpiled ore and targeting about 1.3 tonnes of gold by the end of 2026, according to Europe Mining News. The mine produced about 6.9 tonnes in 2023, roughly one-fifth of Türkiye's gold output. Its suspension followed a heap leach pad failure in February 2024 that killed nine workers and injured two. Turkish conglomerate Cengiz Holding bought SSR Mining's 80% stake earlier in 2026 for US$1.49 billion.
1. What a stockpile-only restart means technically
Existing stockpiled ore has a known grade and a known exposure history. That makes the metallurgical task narrower than a fresh mine start: the leach circuit can be calibrated against material that has already been characterised. In a 堆浸 operation, gold from the pad is recovered from pregnant solution, typically in 柱内碳色谱法 (CIC) service. Solution clarity and 碳 loading rate dominate; hardness matters less than in an agitated tank but still governs handling losses.
2. The licence boundary
The reporting is explicit that the current phase is restricted to existing stockpiles rather than a full return to mining. Any move beyond that depends on permanent permitting and on the views of regulators, local communities and the courts on the site's safety record. A seismic study found the slope had been deforming for at least four years before failure, and an independent review linked the collapse to a third-party design flaw. For a supplier, this is a clear boundary: supply planning should track the licence scope, not assume a full restart.
金三角——三种产品,一家供应商
AuCyan™ 氰化钠 (NaCN) (≥98.3%) · AuCarb™ 黄金回收椰壳活性炭 (≥99% 硬度) · AuLeach™ 黄金浸出剂 (GDA) – 无害
3. Worked volume check
A target of 1.3 tonnes of gold by year-end is roughly 41,800 ounces. If the stockpile leach circuit runs at 80% recovery, the contained gold processed is about 52,000 ounces. At a carbon loading of 2,000 g/t on loaded carbon, that implies around 26 tonnes of loaded carbon over the campaign — a figure that sets the handling and elution schedule. Exact values depend on site data; the method is what matters for planning a bounded restart.
Target: 1.3 t ≈ 41,800 oz
Indicative loaded carbon: ≈ 26 t at 2,000 g/t
4. Reagent fit for a bounded restart
For column service, BC1100 class carbon is the usual evaluation starting point, selected on K and R values measured with site solution. AuCyan™ 氰化钠 NaCN (≥98.3%) 根据许可证进口的船舶 18 MT 每个容器。 AuLeach™黄金浸出剂(GDA)——无害 is evaluated where permitted at 28 MT. All ship with batch COA, TDS 和 MSDS认证 in 25公斤重型复合聚乙烯袋 下 离岸价/到岸价 条款。
3b. Stockpile oxidation and leach kinetics
Stockpiled ore is not fresh ore. Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites, and log solution grade curves rather than relying on historical recovery figures. For a 堆浸 circuit, irrigation rate and solution pH are the two operational levers; for 柱内碳法 recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less — every tonne processed has to earn its place in a bounded campaign.
3c. Stockpiles are not fresh ore
Exposure to weather changes moisture, oxidation state and the distribution of soluble species, all of which affect leach kinetics. On a restart, the first campaigns should be treated as a re-characterisation exercise: sample the stockpile by zone and depth, run column tests on representative composites and log solution grade curves rather than relying on historical recovery figures. For a 堆浸 circuit, irrigation rate and solution pH are the two operational levers; for 柱内碳法 recovery, solution clarity determines whether the carbon loading rate can be realised. Because the licence covers stockpiles only, the schedule is finite. That makes accurate characterisation more valuable, not less: every tonne processed has to earn its place in a bounded campaign.
5。 常问问题
Q1 — What restarted at Çöpler?
Processing of stockpiled ore under a temporary operating licence.
Q2 — What is the target?
About 1.3 tonnes of gold by the end of 2026.
Q3 — Is full mining resumed?
No — the current phase is limited to existing stockpiles.
Q4 — Which recovery route applies?
Heap leaching with carbon-in-column recovery from pregnant solution.
Q5 — What terms are available?
FOB or CIF with batch COA, TDS and MSDS.
Q6 — Do you serve West Asia?
Yes — more than 77 countries including West Asian markets.
Plan supply to the licence scope
Send your stockpile grade and recovery route. We return a column-service carbon and reagent dossier.
WhatsApp +86 173 9270 5576 info@unitedchemicalcn.com
Source: Europe Mining News, November 2026, reporting on the Çöpler stockpile restart.