UNITED CHEMICAL · SEKTÖR HABERLERİ · 27 KASIM 2026
A heap-leach ramp, then a CIL plant
Two processing routes on one site means two qualification programmes.
PT Merdeka Gold Resources Tbk (EMAS), majority-owned by PT Merdeka Copper Gold Tbk, recorded US$43 million in EBITDA as gold production surged 69% quarter on quarter, according to Macau Business reporting on the company's release. The Pani Gold Mine in Gorontalo, Indonesia, has mineral resources of 7.0 million ounces and an estimated 15-year mine life. Production is supported by a heap-leach facility with initial capacity of 8 million tonnes a year. The mine began mining in October 2025, achieved first gold in February 2026 and made its first sales in March 2026.
1. Stage one: heap leaching at 8 Mt/y
A heap-leach facility at this scale is a Karbon-in-column operation in all but name. Gold dissolved in the pad is recovered from pregnant solution on carbon columns, where solution clarity and carbon loading rate dominate. BC1100 Kolon ve diğer malzemeler için genellikle değerlendirilen kalite derecesidir. Yığın liçi service, selected on K and R values measured with the site's own solution.
2. Stage two: CIL from 2028
The company plans to develop a Karbon-Süzülme (CIL) facility targeted to start in 2028 and scale to 12 million tonnes a year by 2029, with peak production of roughly 500,000–700,000 ounces a year by 2031. A CIL plant is a different reagent environment: carbon sits in agitated tanks, so ball-pan hardness and AARL attrition become as important as activity. The two stages therefore need two carbon specifications and two qualification dossiers, even if the same supplier serves both.
Altın Üçgen — üç ürün, bir tedarikçi
AuCyan™ Sodyum Siyanür NaCN (≥%98.3) · AuCarb™ Altın Geri Kazanımı Hindistan Cevizi Kabuğu Aktif Karbonu (≥%99 Sertlik) · AuLeach™ Altın Çözme Maddesi (GDA) – Tehlikeli Olmayan
3. Worked scale check
At 8 million tonnes a year through the heap leach, a siyanür demand of 0.15 kg/t implies about 1,200 tonnes a year of NaCN. At the planned 12 Mt/y CIL plant, demand at 0.25 kg/t would be about 3,000 tonnes a year. Even allowing for estimate error, the move from stage one to stage two multiplies reagent volumes by roughly two to three times. Qualifying the second-stage specification during stage one is the only sensible sequence.
Heap leach, 8 Mt/y at 0.15 kg/t: ≈ 1,200 t NaCN/year
CIL, 12 Mt/y at 0.25 kg/t: ≈ 3,000 t NaCN/year
4. Product fit across both stages
AuCyan™ Sodyum Siyanür NaCN (≥98.3%) supplies leaching at 18 MT konteyner başına. AuCarb™ Altın Geri Kazanımı Hindistan Cevizi Kabuğu Aktif Karbonu (≥%99 Sertlik) is specified differently for column and agitated service at 15 MT konteyner başına. AuLeach™ Altın Liçleme Maddesi (GDA) – Tehlikeli Olmayan İzin verilen yerlerde değerlendirilir. 28 MTTüm gemiler parti numarasıyla gönderilir. COA, TDS hem de MSDS in 25 kg'lık ağır hizmet tipi lamine PE torbalar altında FOB / CIF terimleri.
3b. Ramp-up is where carbon is lost
A 69% quarter-on-quarter production increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted, and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can be loaded unevenly before elution. The mitigation is unglamorous but effective — log column inlet and outlet grades daily, sample carbon loading weekly, and keep a running mass balance rather than relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly, with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve in 2028.
3c. Ramp-up is where carbon is lost
A 69% quarter-on-quarter increase is good news with a hidden cost: ramp-up is the period when consumables are least controlled. Solution grades swing as new pad areas come online, irrigation rates are adjusted and carbon is moved between columns to balance loading. Each change creates a window in which gold-bearing fines can leave the circuit or carbon can load unevenly before elution. The mitigation is unglamorous but effective: log column inlet and outlet grades daily, sample carbon loading weekly and keep a running mass balance instead of relying on monthly averages. When the 2028 CIL plant starts, the same discipline transfers directly with the added variable of tank abrasion. Qualifying both grades during the current heap-leach phase is the only way to avoid a second learning curve.
5. SSS
Q1 — What did EMAS report?
US$43 million EBITDA with gold production up 69% quarter on quarter.
Q2 — What is Pani's resource?
7.0 million ounces of gold with an estimated 15-year mine life.
Q3 — What is planned for 2028?
A CIL facility scaling to 12 Mt/y by 2029.
Q4 — Does carbon spec change between stages?
Yes — column service favours activity; CIL favours hardness and low attrition.
S5 — Hangi şartlar geçerlidir?
Parti bazlı COA, TDS ve MSDS ile birlikte FOB veya CIF.
Q6 — Can carbon be tested first?
Yes — complimentary AuCarb™ and AuLeach™ samples for laboratory testing.
Qualify stage two during stage one
Send both flowsheets. We return a two-stage carbon and reagent specification with staged delivery terms.
İletişim · BC1100 · Altın Üçgen genel bakış · Haberler
WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com
Source: Macau Business, reporting on PT Merdeka Gold Resources Tbk (EMAS) results, November 2026.
- Rastgele İçerik
- sıcak içerik
- Sıcak inceleme içeriği
- ÇEVRE YÖNETİM SİSTEMİ SERTİFİKASI
- Madencilik için oksalik asit %99.6
- Genişletilmiş AN patlayıcı
- Sodyum Metal, ≥%99.7
- Sodyum bisülfit %99 Yüksek Kalite Fabrika Tedarik
- 1Madencilik için İndirimli Sodyum Siyanür (CAS: 143-33-9) - Yüksek Kalite ve Rekabetçi Fiyatlandırma
- 2Sodyum Siyanür %98.3 CAS 143-33-9 NaCN altın işleme maddesi Madencilik Kimya Endüstrileri için Vazgeçilmez
- 3Çin'in Sodyum Siyanür İhracatına İlişkin Yeni Düzenlemeleri ve Uluslararası Alıcılar İçin Rehberlik
- 4Sodyum Siyanür (CAS: 143-33-9) Son kullanıcı sertifikası (Çince ve İngilizce versiyon)
- 5Uluslararası Siyanür (Sodyum siyanür) Yönetim Kodu - Altın Madeni Kabul Standartları
- 6Çin fabrikası Sülfürik Asit %98
- 7Susuz Oksalik Asit %99.6 Endüstriyel Sınıf
- 1Sodyum Siyanür %98.3 CAS 143-33-9 NaCN altın işleme maddesi Madencilik Kimya Endüstrileri için Vazgeçilmez
- 2Yüksek Saflık · Kararlı Performans · Daha Yüksek Geri Kazanım — modern altın liçi için sodyum siyanür
- 3United Chemical'nin Araştırma Ekibi Veriye Dayalı İçgörülerle Otoritesini Gösteriyor
- 4AuCyan™ Yüksek Performanslı Sodyum Siyanür | Küresel Altın Madenciliği için %98.3 Saflık
- 5Dijital Elektronik Patlatıcı (Gecikme süresi 0~ 16000ms)
- 6Yüksek mukavemetli, yüksek hassasiyetli şok tüplü patlayıcı
- 7Sanayi Elektrikli Patlatıcı










Çevrimiçi mesaj danışmanlığı
Yorum ekle: