Bogoso-Prestea Reborn: Heath Goldfields' US$194 Million Plant Restart in Ghana — A Complete Re-Commissioning Playbook for Leach Reagent Re-Qualification, Mill Ramp Sequencing and Underground Ore Domain Testing in 2027

A plant section idle since 2015 is back in production. Re-commissioning is not a maintenance job — it is a full re-qualification of every consumable that touches the ore.

Rehabilitated gold processing plant with leach tanks and carbon adsorption circuit in West Africa

UNITED CHEMICAL · INDUSTRY NEWS · 20 NOVEMBER 2026

A Ghanaian mine returns to life — and to the consumables market

A plant that has been idle does not restart on its old reagent specification.

Heath Goldfields has invested US$194 million reviving the Bogoso-Prestea gold mine in Ghana's Western Region, according to the Business and Financial Times, accessed 20 November 2026. A section of the processing plant idle since 2015 has resumed production while the larger mill is being refurbished. The company plans to reopen the underground mine in the first quarter of 2027 and has ordered new mining equipment for arrival in the same quarter. The rehabilitation involved repairing corroded equipment, replacing damaged components and installing additional facilities. For a reagent supplier, that list is a specification warning.

1. Re-commissioning is a re-qualification exercise

A plant that has been idle does not restart on its old reagent specification. Ore sources change, mill freshness changes, and the first campaign is the point at which Carbon hardness and leach chemistry must be re-validated. The mine's own physical work — repairing corroded equipment and replacing damaged components — has a chemical parallel: the reagent and carbon specification must be rebuilt from first principles.

The reason is that a reagent programme is calibrated against a specific ore and a specific circuit condition. After a long shutdown, both have moved. Mill lining condition changes the particle-size distribution. Different stopes mean different mineralogy. Water chemistry may have changed. Any one of these is enough to invalidate the old dosage curve.

2. The restart checklist

Work streamReported statusReagent implication
Processing plantOne section back in productionRecalibrate carbon and leach dosage
Larger millRefurbishment progressingThroughput-driven consumables ramp
Underground mineTarget Q1 2027 restartNew ore domain needs bottle-roll tests
DewateringUnderway toward safe restartWater chemistry baseline

3. Sequencing supply around a ramp

A staged ramp calls for staged procurement. Initial carbon qualification can run on complimentary samples of AuCarb™ and AuLeach™, with the first commercial volume at 1×20' FCL ≈ 15 MT of carbon under FOB/CIF terms. Sodium cyanide demand follows the licensed-import timetable: AuCyan™ Sodium Cyanide NaCN (≥98.3%) requires an import licence and End-Use Certificate before shipment and moves on an 18 MT container. Each shipment carries a batch COA, TDS and MSDS, packed in 25 kg heavy-duty laminated PE bags.

4. Worked ramp calculation

Suppose the restarted section treats 1,500 t/day at 50% availability during the first quarter, with a cyanide demand of 0.25 kg/t. Monthly demand is 1,500 × 0.30 × 30 × 0.25 = 3,375 kg. Once the larger mill and underground ore are online at 3,000 t/day and 0.32 kg/t, demand rises to 3,000 × 0.85 × 30 × 0.32 = 24,480 kg per month. A single container is clearly insufficient for the second phase; the schedule must be built around the full ramp from the outset.

Phase 1 demand: ≈ 3.4 t/month

Phase 2 demand: ≈ 24.5 t/month

5. Underground ore — a new domain

The underground restart in Q1 2027 introduces ore that the plant may not have treated before. Underground ore often differs from oxide material in sulphide content, hardness and cyanide demand. A fresh bottle-roll programme on the first underground parcels is essential before the reagent setpoint is locked. Where cyanide demand proves uneconomic, AuLeach™ Gold Leaching Agent (GDA) – Non-Hazardous can be evaluated as an alternative route through the same test programme.

5b. The local-procurement dimension

The same reporting notes more than 2,000 jobs supported and GH¢763 million spent on local in-country procurement, including GH¢292 million on goods and services sourced from communities within the mine's catchment area. For a reagent supplier this is a signal about how a restart is expected to behave commercially: local content is not a slogan but a measured line in the project accounts. It does not change the technical specification of Sodium Cyanide or Activated Carbon — those are set by ore and circuit, not by procurement policy — but it does shape how a supplier should structure the conversation. A clear division between imported technical reagents and locally sourced consumables such as lime, steel media and packaging services makes the supply plan easier to audit. It also prevents the common error of assuming that a "local procurement" target applies uniformly to every item on the bill of materials. Imported, licence-controlled reagents follow their own timetable, and that timetable should be stated plainly at the outset rather than discovered mid-ramp.

6. FAQ

Q1 — How much was invested?

US$194 million, according to the Business and Financial Times.

Q2 — Is the plant already producing?

One section idle since 2015 has resumed production; the larger mill is being refurbished.

Q3 — When does underground mining restart?

The first quarter of 2027.

Q4 — Why re-qualify reagents on a restart?

Because ore, mill condition and water chemistry change during a shutdown.

Q5 — What are the commercial terms?

FOB or CIF, with batch COA, TDS and MSDS.

Q6 — Are samples available?

Yes — complimentary samples of AuCarb™ and AuLeach™ for independent laboratory testing.

Support a restart campaign

Tell us your ramp schedule and ore domains. We will sequence qualification samples and commercial containers to match.

Contact Us · AuCarb™ guide · Leaching reagents · Industry News

WhatsApp +86 173 9270 5576 · info@unitedchemicalcn.com

Source: Business and Financial Times (Ghana), "Heath Goldfields targets full production", accessed 20 November 2026.

You may also like

Online message consultation

Add comment:

+8617392705576WhatsApp QR CodeScan QR code
Leave a message for consultation
Thanks for your message, we will contact you soon !
Submit
Online Customer Service